In the country, off the main road, partly cleared 5 acres to build the home of your dreams! The engineer's site plan was originated in 1997 and updated in 2010 shows proposed sites for septic and well. There is electric on the site. Driveway has been excavated and has fabric base.
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...